Louis Baker Construct Ltd.

  • Home
  • Residential
  • Commercial
  • Bespoke Furniture
  • Kitchens
  • Bathrooms
  • Wardrobes

Louis Baker Construct Limited

  • Callender Howorth
  • Testimonials
  • Contact Us

Bespoke

  • Aberdare Gardens 2011
  • Ardmore
  • Barbican Pad
  • Benn Street 2011
  • Bermondsy Appartment
  • Bloomsbury Bed 2011
  • Boltons House
  • Brandopus 2011
  • Charcote House
  • Chiddingstone Street 2011
  • Christchurch Avenue 2013
  • Contemporary Desk 2010
  • Eton House 2015
  • Flamingo 2003
  • Flamingo 2007
  • Garden Table
  • Harringey House
  • Highgate
  • Hill House 2011
  • Hythe House
  • Irish Embassy 2015
  • Kingston Unit
  • Ladbroke Road
  • Library unit 2010
  • Limehouse
  • Limerston Street 2014
  • Nottingham road 2014
  • Oak House 2011
  • Old Ford 2014
  • Palmerston Mansions
  • Parragon School
  • Perugia Bar 2010
  • Play Castle
  • Reception Desk
  • RiversRunRed
  • Rufus Leonard
  • Simply Bespoke Furniture 2012
  • St Margarets Media unit 2015
  • Stratford Studios 2010
  • The Grove 2011
  • Windsor 2010
  • York Mansions
  • Yorkway Penthouse
  • See more Commercial
Reception Desk Stainless Steel Framework
  • Conference Table Finger Jointed
  • Conference Table Solid Oak
  • Pigeon Hole Stainless Steel Framework
  • Pigeon Hole Maple Wood
  • Reception Desk Spray Painted Mdf
  •  
    Reception Desk Stainless Steel Framework

Bespoke Rufus Leonard

We built a conference room meeting table and Pool table-top made with fingered jointed solid oak edging and oak veneered top. The reception desk was made with spray-painted MDF and had a stainless steel framework and top shelf. The Pigeon hole unit was made from maple wood with a stainless steel framework.

louis baker construct ltd.